Skip to main content
Template Illustration

You also get the following 3 Excel spreadsheets with the static Word template:
Cost Summary Calculator, Implementation Plan Calculator, Construction Schedule Calculator

Excel spreadsheets are only used with the static Word template. If you get a Proposal Pack or the Professional Bundle, these pages are calculated and built using an automated line-item database in the included software.

What's Included
 
 
 
This single static template
 
 
 
Calculator spreadsheets
     3
    60
   150
Create variations of this template
 
 
 
All 2200 chapter templates
 
 
 
All 727 proposal layouts
 
 
 
All 200 completed samples
 
 
 
Novice quoting software
 
 
 
All 340 contract templates
 
 
 
All 110 project templates
 
 
 
Expert quoting software
 
 
 
Document branding features
 
 
 

How to write your Stormwater Facility Low Impact Development Proposal

We include this 22 page layout with every Proposal Pack. If you want this template to have a different visual design theme than the one illustrated here, purchase any Proposal Pack design and create this template using the purchased design theme. If you get a Proposal Pack or the Professional Bundle, you can also make any variation of this template with different chapters to suit your needs.

We typically include more chapters in the templates than most people will need to give everyone more variety in the chapters they may need. You can trim down a long template by removing pages you do not need or combining multiple chapter topics into one page.

Supported Operating Systems LogosDOWNLOADABLE, ONE-TIME COST, NO SUBSCRIPTION FEES
Proposal Pack for Any Business Screenshot of Pages

( Design themes, color schemes, fonts, and images are all customizable.
Proposal Kit branding and illustration image are removed from your finished document. )

This set of chapters was selected for a construction of a low impact development (Lid) for a stormwater management facility (SWMF) retrofit proposal.

You can also create countless variations of this document to suit your needs using the included library of 2200+ chapters if ordering a Proposal Pack or Pro Bundle.
Quote Logo What Our Clients Say

This gave me an incredibly easy way to put together the framework for each proposal so all I had to do was fill in the pages with my content and specifics. It also gave me ideas of information to include in a proposal that I never thought of before making the end proposal more complete and ultimately winning more projects."

J.K.
Fly Alaska

Related Article

Related Video

Related Templates

What's the best way to write your stormwater facility low-impact development proposal?

Using the Proposal Kit template and software package is a proven solution for creating a low-impact development proposal for a stormwater facility. The Proposal Kit's template library and Wizard software program streamline proposal creation with extensive templates, including a line item quoting database system. This system assists you in creating detailed cost summaries, quotes, estimates, budgets, and other financial documents necessary for your proposal's success.

This type of proposal is typically a response to a government RFP, which means each RFP will be unique and require an exceptional response. The Proposal Kit is designed to create such RFP responses and includes pre-made starting layouts that can be further customized.

Are you currently tasked with writing a proposal for a low-impact development such as a stormwater management facility? If so, the Proposal Kit simplifies your process and improves your bid's success rate.

What Types of Projects Are Stormwater Facility Low Impact Development Proposals Written For?

Regarding stormwater facility low-impact development projects, the scope can vary broadly. These proposals are often crucial for ensuring environmental compliance and sustainability in urban planning. Here are some common project types that a stormwater facility low-impact development proposal would be written for:

  • Urban retrofit projects
  • New residential development drainage systems
  • Commercial real estate runoff management
  • Industrial site stormwater containment
  • Green roof installations
  • Permeable pavement implementations
  • Rain garden designs and installations
  • Wetland restoration and creation
  • Streambank stabilization projects
  • Flood management and mitigation systems
  • Erosion control solutions
  • Wildlife habitat improvement initiatives
  • Stormwater pond construction and maintenance
  • Highway drainage systems
  • Municipal park drainage upgrades
  • School campus stormwater systems
  • Shopping center water management solutions
  • Airport runoff control systems
  • Golf course water hazard management
  • Agricultural runoff management systems

 

Chapters this template is built with

No single template fits all scenarios. With Proposal Kit, you can create a highly tailored document that addresses the specific needs of a stormwater facility low-impact development project. Proposal Kit's software allows you to create custom proposals from an extensive library of thousands of chapters such as this layout. Here's how some of the templates can be specifically used:

Cover Letter

Introduce your proposal and establish a professional first impression, outlining the intent to provide a solution for the stormwater facility. Specifically, mention the overall goal of implementing a low-impact development (LID) approach for the stormwater management facility (SWMF) retrofit and briefly touch on your company's expertise in this area.

Executive Summary

Summarize the proposal's key points, highlighting the innovative low-impact development techniques and expected outcomes. Include a brief overview of how these techniques will reduce environmental impact, improve water quality, and comply with regulatory requirements.

Needs Assessment

Detail the site's needs and challenges, demonstrating your understanding of the project requirements. This could involve identifying issues such as erosion, water quality degradation, or inadequate stormwater infrastructure necessitating a low-impact development retrofit.

Retrofitting

Explain how existing structures or systems will be upgraded to incorporate low-impact development technologies. Describe specific retrofitting methods, such as installing permeable pavements, green roofs, or bioretention systems to enhance the facility's stormwater management capabilities.

Restrictions

Discuss any legal or environmental restrictions and how they will be managed within the project scope. Provide details on local zoning laws, environmental protection regulations, and any permitting processes required for the SWMF retrofit, ensuring all restrictions are addressed in the proposal.

Environmental Impact

Assess and describe the environmental benefits of the proposed low-impact development, ensuring regulatory compliance. Include detailed analyses of how the retrofits will improve water quality, reduce runoff, enhance groundwater recharge, and support local biodiversity.

Accessibility

Ensure that all aspects of the stormwater management system are accessible for maintenance and monitoring, following ADA guidelines. Discuss how access paths, monitoring stations, and maintenance facilities will be designed and located to ensure easy access.

Project Management

Outline the project management plan, including timelines, staffing, and communication strategies. Define the project's phases, key milestones, team members' roles and responsibilities, and how progress will be communicated to stakeholders.

Construction Schedule

Provide a detailed timeline for the project's phases from initiation to completion, ensuring stakeholders are well informed. Break down the timeline into pre-construction activities, main construction tasks, and post-construction activities, with specific start and end dates for each phase.

Implementation Plan

Describe how the project will be implemented, including coordination with local authorities and stakeholders. Outline the steps from initial planning and design, procurement of materials, construction, and final inspection, ensuring smooth implementation and adherence to schedule.

Site Preparation

Detail the project's initial steps, from site clearing to setting up the necessary infrastructure. Specify actions such as removing existing vegetation, grading the site, and installing erosion and sediment control measures to prepare the site for construction.

Construction

Discuss the construction methodologies that will be employed to ensure minimal environmental impact. Highlight sustainable construction practices, low-impact equipment, and techniques that minimize soil disturbance and protect nearby water bodies during the retrofit.

Cleanup

Plan for post-construction cleanup and site restoration to minimize environmental disruption. Include strategies for removing construction debris, restoring vegetation, and ensuring the site is returned to a stable and functional state after the retrofit is completed.

Cost Summary

Present a detailed financial plan using Proposal Kit's quoting database for accurate budgeting. Provide itemized costs for each project phase, including materials, labor, equipment, permits, and contingencies, ensuring stakeholders understand the financial requirements clearly.

Warranty

Specify the warranty terms for the construction and materials used in the project. Detail the duration of the warranty, coverage for defects in workmanship and materials, and procedures for making claims, ensuring long-term confidence in the retrofit's quality.

Emergency Response Plan

Develop a response plan for potential emergencies related to the stormwater management system. Describe actions to be taken in case of flooding, system failures, or hazardous material spills, including emergency contact information and communication protocols.

Company History

Showcase your company's experience and past success in similar projects to build credibility. Include examples of previous low-impact development projects, client testimonials, and any awards or recognitions received that demonstrate your expertise in the field.

Team Members

Introduce the project team and outline their qualifications and roles. Provide brief biographies and relevant experience of key team members, emphasizing their expertise in low-impact development and stormwater management.

Qualifications

Highlight the specific skills and certifications that make your team ideal for undertaking the project. Mention any relevant professional licenses, certifications, and specialized training your team possesses, ensuring stakeholders of your team's capability to execute the retrofit successfully.

Use cases for this template

Transforming Urban Runoff Management

The Challenge

Emma, a senior project manager at GreenScape Innovations, was confronted with a task. She needed to design a comprehensive runoff management system for a newly developed urban area. The city's rapid growth has led to significant stormwater runoff issues, causing frequent flooding and water contamination. The city council demanded a sustainable solution to address these immediate concerns and offer long-term environmental benefits. With a tight deadline and complex ecological regulations to navigate, Emma needed a reliable tool to streamline her proposal development process.

The Solution

Emma turned to Proposal Kit to create an organized and persuasive proposal outlining the innovative low-impact development techniques. The extensive library of templates allowed her to quickly gather the necessary chapters, such as Environmental Impact, Needs Assessment, and Implementation Plan. She used the line item quoting database to estimate costs and ensure her budget was on point. The Proposal Kit's Wizard software guided her in structuring the proposal to highlight the technical specifications and benefits effectively.

The Implementation

Emma filled out each section of the proposal using Proposal Kit's templates. In the Environmental Impact section, she detailed how the proposed green roofs, rain gardens, and permeable pavements would reduce runoff and improve water quality. The Needs Assessment chapter illustrated the current issues faced by the urban area, supported by data and case studies. In the Implementation Plan, she outlined a phased approach to constructing the stormwater management systems, ensuring minimal disruption to the community. The Proposal Kit made it easy for Emma to present a cohesive and compelling argument, complete with visuals and cost breakdowns.

The Outcome

The city council was impressed with the clarity and comprehensiveness of Emma's proposal. The detailed financial plan and environmental benefits outlined in the proposal made it easy for them to justify the project's cost. As a result, the council approved the proposal and allocated the necessary funding. Implementing the low-impact development techniques significantly improved urban water quality and reduced flooding incidents, showcasing GreenScape Innovations as a leader in sustainable urban development.

Revitalization of Commercial Property through Sustainable Drainage

The Challenge

Liam, an environmental engineer at EcoBuild Ventures, was tasked with retrofitting the stormwater system for an aging shopping center. The system needed to be updated and more efficient, leading to frequent flooding in the parking lot and surrounding areas. The property's owners were concerned about the financial implications of such a massive overhaul and needed a detailed proposal to understand the costs and benefits. Liam faced the challenge of designing a practical solution and convincing the stakeholders of its feasibility and long-term value.

The Solution

Liam used the Proposal Kit to develop a compelling proposal highlighting the retrofit's benefits and feasibility. The software's extensive template library provided him with the necessary chapters to address all aspects of the project. He focused on chapters like Retrofitting, Cost Summary, and Environmental Impact. The line item quoting database helped him generate an accurate cost estimate, which is essential for gaining stakeholder buy-in. Proposal Kit enabled him to structure the proposal logically, making it easy for stakeholders to follow and understand.

The Implementation

Liam filled in each section of the proposal, starting with a detailed Needs Assessment that outlined the current issues and their impact on the shopping center. In the Retrofitting chapter, he described the proposed upgrades, such as installing permeable pavements and bio-retention areas, explaining how these would mitigate flooding. The Cost Summary section provided a transparent breakdown of the projected expenses, complete with justifications for each line item. The Environmental Impact chapter highlighted the long-term benefits, including reduced runoff and improved local water quality. Proposal Kit's templates made it easy for Liam to present a professional and comprehensive proposal.

The Outcome

The thoroughness and clarity convinced the shopping center's stakeholders of Liam's proposal. The detailed cost summary and environmental benefits made it clear that the retrofit was a worthwhile investment. As a result, the project was approved, and EcoBuild Ventures commenced the retrofit. The new stormwater system resolved the flooding issues and enhanced the property's value and environmental footprint, attracting more visitors and businesses to the shopping center.

Enhancing School Campus with Eco-Friendly Water Solutions

The Challenge

Sophia, the director of Future Green Campuses, was responsible for designing a low-impact development plan for a large school district. The district's existing stormwater management system needed to be improved, leading to frequent waterlogging and erosion on school grounds. The school board was eager to adopt environmentally friendly practices but needed a detailed proposal to secure funding and approval. With multiple campuses to consider and diverse stakeholders, Sophia needed a robust tool to help her create a comprehensive and convincing proposal.

The Solution

Sophia chose Proposal Kit for its comprehensive templates and easy customization. The template library included chapters ideally suited to her needs, such as Site Preparation, Accessibility, and Benefits. Proposal Kit's Wizard software guided her in structuring the proposal, ensuring that she covered all the necessary aspects. The line item quoting database allowed her to create an accurate budget, which was critical for gaining the school board's approval. The software's ease of use enabled her to focus on creating a narrative and persuasive argument.

The Implementation

Sophia created each section of the proposal using the Proposal Kit's templates. In the Needs Assessment chapter, she details the campuses' current issues, supported by photographs and data. The Implementation Plan described the proposed solutions, such as rain gardens, permeable pavements, and green roofs, emphasizing their educational value for students. The Cost Summary provided a clear financial plan, illustrating how the project would be funded and its long-term economic benefits. The Proposal Kit made it easy for Sophia to present a professional and comprehensive proposal with visuals and supporting documents.

The Outcome

The school board was impressed by Sophia's thoroughness and clarity of proposal. The detailed environmental benefits and educational opportunities outlined in the proposal made it easy for them to approve the project. With the funding secured, Future Green Campuses implemented the low-impact development plan across the district. The new stormwater management systems improved the campuses' drainage and provided hands-on learning opportunities for students, fostering a greater awareness of environmental sustainability.

Conclusions and Recommendations

Writing a low-impact development proposal for a stormwater facility can be challenging, but with Proposal Kit, you can create compelling, professional, and customized proposals. By addressing financial, environmental, and project-specific details through a structured template approach, Proposal Kit helps ensure your proposals are thorough and persuasive. Whether you're retrofitting urban infrastructure, enhancing commercial properties, or upgrading educational campuses, Proposal Kit provides the tools necessary for success.

Also Known As

This template may also be referred to in different ways or be used in more specialized situations, such as:

  • Stormwater Management Retrofit Proposal
  • Low Impact Development (LID) Project Proposal
  • SWMF Construction Proposal
  • Environmental Impact Development Proposal
  • Urban Stormwater System Upgrade Proposal
  • Stormwater Compliance and Sustainability Proposal
  • Green Infrastructure Project Proposal
  • Eco-Friendly Water Management Proposal
  • Advanced Stormwater Treatment Proposal
  • Sustainable Urban Drainage Systems Proposal

 

Frequently Asked Questions

What should I include in a stormwater facility low-impact development proposal?

Start with a cover letter and an executive summary that outlines the project's goals and anticipated benefits. Include a detailed needs assessment to demonstrate your understanding of the site's requirements. Follow this with sections on retrofitting existing structures, environmental impact assessments, and legal or environmental restrictions. Don't forget to add a project management plan, a construction schedule, and a detailed cost summary using Proposal Kit's line item quoting database. Each section helps stakeholders grasp your project's scope and feasibility.

How can I communicate the environmental benefits of my proposed stormwater facility's low-impact development?

Effectively communicating the environmental benefits of your stormwater facility's low-impact development involves clear and detailed descriptions of how your project will improve water quality, reduce runoff, and promote sustainable land use. Use the environmental impact section of your Proposal Kit template to provide data and projections on the anticipated benefits. Highlight innovative techniques such as permeable pavements, green roofs, and rain gardens, explaining how they reduce stormwater runoff and enhance local ecosystems. Including visuals, such as charts or before-and-after scenarios, can also be very effective in conveying the positive impact of your project.

How can Proposal Kit help streamline the proposal writing process for a stormwater facility low-impact development project?

Proposal Kit streamlines the proposal writing process by providing an extensive library of customizable templates that cater specifically to stormwater facility low-impact development projects. The software's Wizard program simplifies the organization and customization of these templates, ensuring you cover all necessary topics, such as site preparation, construction, and emergency response plans. Additionally, the Proposal Kit includes a line item quoting database that helps you create accurate cost summaries and budgets. This comprehensive toolset enables you to produce professional, detailed proposals under tight deadlines efficiently.

What financial details should be included in the cost summary for a stormwater facility low-impact development proposal?

In the cost summary of a stormwater facility low-impact development proposal, it's essential to provide a detailed breakdown of all expenses related to the project. This includes initial costs for site preparation, materials, labor, and construction. It would help if you also accounted for ongoing maintenance costs and contingency funds for unexpected expenses. Using Proposal Kit's line item quoting database, you can ensure that all financial details are precise and well-documented. This transparency not only builds trust with stakeholders but also helps in securing project funding and approval.

How do I address potential regulatory and environmental restrictions in my stormwater facility's low-impact development proposal?

Addressing regulatory and environmental restrictions in your stormwater facility's low-impact development proposal requires thorough research and clear communication. In the restrictions section of your Proposal Kit template, outline the specific regulations and environmental guidelines that apply to your project. Explain how your proposal complies with these regulations, including any mitigation strategies for minimizing environmental impact. Provide documentation and references to local, state, or federal guidelines to bolster your proposal's credibility. By proactively addressing these restrictions, you demonstrate your commitment to environmental stewardship and regulatory compliance, which can significantly enhance the approval chances of your project.

15% Off Discount

Proposal Kit chapters used in this template

Cover Letter, Title Page, Table of Contents, Executive Summary, Cost Summary, Needs Assessment, Accessibility, Emergency Response Plan, Implementation Plan, Site Preparation, Retrofitting, Cleanup, Construction Schedule, Project Management, Environmental Impact, Restrictions, Construction, Qualifications, Company History, Team Members, Warranty, Back Page

Included Calculator Spreadheets

These Excel calculator spreadsheets are included with this template. If you purchase a Proposal Pack or the Professional Bundle, these proposal pages are generated using an automated line-item database in the included Wizard software. The calculator spreadsheets are intended for use when purchasing only the static Word template.

Cost Summary Calculator, Implementation Plan Calculator, Construction Schedule Calculator

You use this proposal for

  • General business proposal
  • Non-technical proposal
  • Project pitch proposal
  • RFP response
  • Construction, contracting, building proposal

How to create this template with Proposal Pack Wizard

You can create this document using any of the logo-designed Proposal Packs. Pick any Proposal Pack with a logo design theme you like best; they will all work equally well. The Proposal Pack for Any Business is the pack with no extra added logos or colors - designed to be used plain or for you to customize with your logos and graphics.

The Proposal Pack design theme you purchase will determine the visual look of this template. The screenshot above only shows the plain generic design theme. Names and stories in examples are fictional; however, the templates are from real client use cases.

We include a library of chapters to be assembled based on your needs. All proposals are different and have different needs and goals. We designed Proposal Pack so you can customize the documents to suit your needs.

You will best create this document using the Proposal Pack Wizard - Expert Edition software to select this template and build it in the Proposal Pack logo design theme of your choice along with any desired customizations (such as adding additional chapters, removing unneeded chapters, changing the order of chapters, and importing your company logo). This template outlines a proposal for the described situation. Each user is responsible for typing in the actual content of the provided pages with their information to complete the proposal.

You create this template using the Wizard software with an entire Proposal Pack library and software. We include the Expert Edition of the software in the Proposal Kit Professional bundle. Microsoft Word for Windows is required to use the customizing software. You can also edit Word document templates in other office software such as Word for Mac. We will assist Mac users in assembling complex templates for their first project if they do not have the required platform to run the Wizard software.

You only get the single assembled Word document if purchased as a stand-alone template. The individual template products include no other templates, samples, or software.

How to Build Templates Featured on Proposal Kit Website

Many people find the Proposal Kit website after searching for a specific proposal. Once you've purchased and installed the software, how do you build that template you found in the first place? This video shows you how to build any proposal you see on the Proposal Kit website.

Key Takeaways

  • The Stormwater Facility Low Impact Development Proposal is available as a ready-to-edit template.
  • You can create unlimited custom variations of this template using a Proposal Pack or the Professional Bundle.
  • Using a Proposal Pack or Professional Bundle, you can automate quotes and other financial pages with a line-item database.
  • There are no ongoing subscription fees. You get lifetime unlimited use.
  • We made Proposal Kit for freelancers, small businesses, and non-profits.
  • Proposal Kit product content (templates, samples, software) is 100% written by humans.
Proposal Kit LogoPublished by Proposal Kit, Inc.
© 1997 - 2024, Proposal Kit, Inc. All rights reserved. Privacy Policy.